|
Portos e Caminhos de Ferro de Moçambique (abbreviated CFM; in English Mozambique Ports and Railways) is the parastatal authority that oversees the railway system of Mozambique and its connected ports. The rail system is composed of a total of 2,983 km rail of the gauge that is compatible with neighboring rail systems. In addition there is a 140 km line of gauge, the Gaza Railway.〔(CIA factbook )〕 The system developed over more than a century from three different ports at the Indian Ocean that serve as terminals for separate lines to the hinterland. The railroads were major targets during the Mozambican Civil War, were sabotaged by RENAMO, and are being rehabilitated. Management has been largely outsourced. At this time there is no directly interconnecting rail service between the three lines. Each line has its own development corridor. In August 2010, Mozambique and Botswana signed a memorandum of understanding to develop a 1,100 km railway through Zimbabwe, to carry coal from Serule in Botswana to a deepwater port at Techobanine Point in Mozambique.〔(【引用サイトリンク】accessdate=2010-09-10 )〕 == Nacala railroad / CFM Norte == Nacala is the terminal of the Nacala Railway, the most recent addition to the railway system. It connects the ''Nacala Development Corridor'' and links to the Central East African Railway (CEAR) of Malawi. The railway system is operated by Corredor de Desenvolvimento do Norte. Vale recently bought a stake in the operator; a link is planned from Moatize (where Vale has coal mines) to Malawi, hence connecting to the existing line to Nacala.〔(【引用サイトリンク】accessdate=2010-11-02 )〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Mozambique Ports and Railways」の詳細全文を読む スポンサード リンク
|